Power Rail installation vehicle built by ONVALLA

1 / 2

Crane & Hoist

Power Rail Installation Vehicles for the MRT Pink and Yellow Lines

Eight Power Rail installation sets, co-designed with a partner and built and tested by ONVALLA, for Thailand's first straddle monorail lines.

Year
2020
Product / system
Special-purpose handling equipment

Discuss a similar project

Project overview

ONVALLA and a partner jointly designed vehicles that carry and install the Power Rail, the main power supply of the MRT Yellow Line (Lat Phrao–Samrong) and Pink Line (Khae Rai–Min Buri). Each set has a small vehicle for tools and equipment and a large vehicle for Power Rail sections and accessories up to about 11 metres long, driven by a generator powering electric motors. The first set was installed at the Pink Line Main Depot at the end of September 2020.

Key specifications

ProjectsMRT Yellow Line and MRT Pink Line
System typeStraddle monorail, the first in Thailand
Sets produced8 sets, built and tested by ONVALLA
DriveGenerator driving electric motors
Longest loadPower Rail up to about 11 m

View all projects

Planning a similar project?

Tell ONVALLA engineers about your site, loads and timeline, and we will recommend a solution and the next steps.

Discuss a similar project