Project References

Engineering Projects Delivered by ONVALLA

Real projects from our crane and hoist, Limitless Energy and service teams: ABUS crane installations, special handling equipment, crane relocation, solar rooftops and EV charging stations across Thailand.

1990

Founded by a group of experienced engineers

4,000+

Projects

2006

ABUS Crane Systems agent in Thailand

16,724 kW

Solar capacity installed, 2021–2025

All projects

Solar rooftop systems designed and installed for industrial facilities.

Showing 8 of 8 projects

How we work

From Challenge to Solution

Each reference shows not only what we built, but the customer need behind it and how ONVALLA delivered.

Customer challenge

We start from the load, the building or site, the energy use and the limits the customer works within.

Engineering solution

Our engineers select and design the crane, hoist, solar or charging system that fits those conditions.

Implementation

Manufacture, installation or relocation is planned and carried out by our own teams, with safety first.

Result and support

Testing and handover, with legal documents where required, followed by after-sales service.

FAQ

Questions About Our Projects

Short answers drawn from the project references above.

What kinds of projects has ONVALLA delivered?

Crane and hoist installations (including 14 ABUS cranes for two precast concrete factories), special handling equipment such as Power Rail installation vehicles for the MRT Pink and Yellow monorail lines, crane relocation and repair services, solar rooftop systems from 10.36 kWp to 1,760.35 kWp, and EV charging stations for an electricity utility and a commercial bank.

Which ABUS crane projects has ONVALLA completed?

Examples include 14 ABUS overhead and gantry cranes of 20–80 tons at two precast concrete factories in Pathum Thani, the relocation of two 25-ton ABUS double-girder gantry cranes in Phra Nakhon Si Ayutthaya, a 10-ton ABUS gantry crane in Tak and an ABUS 40/25/1.6-ton double-girder overhead crane in Bangkok.

Can ONVALLA relocate an existing crane?

Yes. Crane relocation covers site survey and planning, dismantling, transport, re-installation, testing and commissioning. For the two 25-ton gantry cranes in Ayutthaya, ONVALLA also carried out a load test and prepared the Por Jor. 1 documentation required by law.

What size solar systems has Limitless Energy installed?

References range from a 10.36 kWp home system in Bangkok to a 1,760.35 kWp rooftop in Rayong. Between 2021 and 2025 Limitless Energy installed 16,724 kW of solar capacity in total.

Which EV charging projects has ONVALLA delivered?

ONVALLA supplied and installed a Schneider EVlink Pro DC 180 kW charger for a Thai electricity utility and EV charging stations for a commercial bank. ONVALLA is an authorized distributor of Schneider Electric and Grasen EV chargers in Thailand.

Have a Project in Mind?

Whether you need a crane or hoist system, a crane relocation or an energy solution, the ONVALLA team will help you plan a solution for your site.

ONVALLA Co., Ltd. · Tel. (+66) 02-193 5380-5 · info@onvalla.com