Preventive maintenance (PM) services a crane on a fixed schedule. Predictive maintenance uses real data such as running hours, lift cycles and accumulated load to forecast which parts are near end of life and replace them before failure. Using both reduces unplanned stops and lets you budget parts ahead.
Key Takeaways
- Scheduled PM is the base; predictive maintenance replaces parts by real condition.
- Operators check every shift, technicians monthly to quarterly, and legal tests fall every 3 months, 6 months or year by capacity.
- You can start by logging motor hours and wear values, without sensors everywhere.
PM vs. Predictive vs. Breakdown Repair
| Approach | Principle | Advantage | Limitation |
|---|---|---|---|
| Breakdown | Repair after failure | No upfront cost | Production stops, accident risk |
| Scheduled PM | Inspect and replace on schedule | Can be planned, fits legal test cycles | May replace too early or too late |
| Predictive | Replace by actual condition | Best use of parts, less downtime | Needs data and skilled interpretation |
Crane PM Checklist by Interval
Before every shift (operator)
- Emergency stop and upper/lower limit switches work
- Brake holds the load without slipping
- Rope or chain is not twisted, no broken wires, hook has a safety latch
- No abnormal noise when lifting or travelling
Monthly to quarterly (technician)
- Measure brake lining wear and adjust
- Check gear oil, drum grooves, wheels and rails
- Check cables, contactors and remote control
Legal cycle: 3 months, 6 months or 1 year (registered or licensed tester)
- Test components and equipment under clause 58 of the 2021 Ministerial Regulation and the Por Jor 1 form, for example every 6 months for industrial cranes above 3 t up to 50 t
- Assess remaining hoist life from running hours and duty class

How to Start Crane Predictive Maintenance in 4 Steps
- Collect usage data: motor hours, switching cycles and overload events. Many newer hoists record these internally.
- Set alert limits: for example when a set share of design life is used, or brake lining reaches the manual’s limit.
- Keep reports in one place: PM results, legal tests and repair history, ready for safety inspectors.
- Stock critical parts: brake linings, contactors and ropes for your models. See crane spare parts and repair.
Example: Estimating Remaining Hoist Life
An FEM 2m hoist has a theoretical design life of 1,600 hours at full load. If records show 1,200 full-load-equivalent hours used, 75% of the design life is gone, so plan a hoist overhaul or replacement in advance. Converting actual hours to full-load equivalent needs the load spectrum and an assessment by an engineer or the manufacturer.
How Often Should PM Be Done?
| Type of work | Suggested PM interval |
|---|---|
| Light, occasional (M3–M4) | Manufacturer’s manual, and no less than the legal test cycle |
| Regular production (M5) | Quarterly |
| Heavy, multi-shift (M6 and above) | Monthly to quarterly, depending on wear |
This is a starting point; follow the manual and actual findings. Related: why good PM goes beyond the checklist.
Frequently Asked Questions
How often should crane PM be done?
It depends on the manual and duty class. Heavy multi-shift work needs shorter intervals than light work, in addition to the legal test every 3 months, 6 months or year depending on capacity.
Does ONVALLA maintain other crane brands?
Yes. ONVALLA maintains ABUS, EGON and other crane and hoist brands already on site. The scope is confirmed after a condition survey.
Is an annual PM contract better value than call-out repair?
For cranes in the main production line it usually is, because inspections are guaranteed and problems are found before the crane stops. See crane service contracts.
Does predictive maintenance need sensors everywhere?
No. Start with available data such as motor hours, cycles, brake lining wear and rope diameter, then add monitoring on critical cranes.