FEM class (FEM 9.511) and ISO M-class (ISO 4301) group hoists by how hard they work. Two values set the class: load spectrum (how often you lift near full load) and average operating time per day. A higher class withstands heavier continuous work; too low a class wears out the motor, brake and gearbox early.
Key Takeaways
- FEM 2m equals ISO M5, and FEM 3m equals ISO M6.
- Each step up roughly doubles the theoretical design life at full load.
- You can find the class you need from lifting height, cycles, working hours and lifting speed.
FEM to ISO Conversion Table
| FEM 9.511 | ISO 4301 | Theoretical life at full load (h) | Typical work |
|---|---|---|---|
| 1Bm | M3 | 400 | Light, occasional use such as maintenance |
| 1Am | M4 | 800 | General factory work, part of the day |
| 2m | M5 | 1,600 | Regular production |
| 3m | M6 | 3,200 | Heavy work over several shifts |
| 4m | M7 | 6,300 | Very heavy work such as foundries and ports |
| 5m | M8 | 12,500 | Extreme continuous duty |
What Are the 4 Load Spectrum Levels?
| Level | Approx. k value | Meaning |
|---|---|---|
| L1 light | Up to 0.50 | Mostly well below capacity, full load rarely |
| L2 medium | 0.50–0.63 | Mixed loads, sometimes full load |
| L3 heavy | 0.63–0.80 | Often near full load |
| L4 very heavy | 0.80–1.00 | Full load on almost every lift |
How to Calculate Average Operating Time per Day
t = (2 x H x N x T) ÷ (60 x V)
- t = average hoist operating time per day (hours)
- H = average lifting height per cycle (m); the 2 covers lifting and lowering
- N = cycles per hour
- T = working hours per day
- V = lifting speed (m/min)
Example: 4 m average lift, 20 cycles per hour, 16 hours per day, 8 m/min lifting speed gives t = (2 x 4 x 20 x 16) ÷ (60 x 8) ≈ 5.3 hours per day.
How Do You Pick the Class?
Compare t with the load spectrum below. Each cell is the maximum average operating time per day in hours.
| Load spectrum | 1Bm (M3) | 1Am (M4) | 2m (M5) | 3m (M6) | 4m (M7) |
|---|---|---|---|---|---|
| L1 light | 2 | 4 | 8 | 16 | Over 16 |
| L2 medium | 1 | 2 | 4 | 8 | 16 |
| L3 heavy | 0.5 | 1 | 2 | 4 | 8 |
| L4 very heavy | 0.25 | 0.5 | 1 | 2 | 4 |
In the example, t = 5.3 hours means 2m (M5) for L1 work, 3m (M6) for L2 and 4m (M7) for L3. Use this table for a first estimate and confirm it with the manufacturer’s table and an engineer before ordering.

Signs Your Duty Class Is Too Low
- The motor runs hot and thermal protection trips often
- Brake linings wear faster than the manual states
- The gearbox is noisy, or rope and chain need early replacement
If you see these signs, record the real working cycle and set up a preventive and predictive maintenance plan.
Frequently Asked Questions
What is the difference between M5 and M6?
M6 (3m) has a theoretical design life of about 3,200 hours at full load, against 1,600 hours for M5 (2m), so roughly double. It suits multi-shift production with frequent heavy lifts.
Where can I find the FEM class of my hoist?
On the hoist name plate or in the manufacturer’s specification.
Should I simply choose a higher class?
A margin makes sense if you plan to raise output, but too high a class adds cost without benefit. Have an engineer calculate it from your real work.
Is FEM class linked to rated load?
Yes, through use. The same hoist may carry different ratings in different classes; for example, a lower working load can give a higher class. Always follow the manufacturer’s documents.
Ask ONVALLA to Calculate Your Duty Class
Send lifting height, cycles, working hours and real loads, and our engineers will help estimate the class before you choose a model. Read next: ABUS wire rope hoist guide, chain vs. wire rope hoist and factory crane price.
References
- FEM 9.511 Rules for the Design of Serial Lifting Equipment: Classification of mechanisms
- FEM 9.512 (FEM European Materials Handling Federation)
- ISO 4301-1 Cranes: Classification